Skip to content
Kitchen Suppression Due

Language: English · 华人餐馆中文指南 (/zh)

UL 300 hood nozzle flow-point & fusible link estimator

Commercial wet-chemical kitchen suppression cabinets allocate extinguishing agent using flow points (or manufacturer flow units) across three distinct zones: cooking appliances on the line, the grease-filter plenum behind the baffles, and exhaust duct collars heading toward the roof fan. Enter your fryers, ranges, charbroilers, woks, griddles, and canopy dimensions below to estimate planning flow points, agent tank count, and semi-annual fusible link replacements.

1. Cookline appliances, hood length & detection

Select a commercial cookline preset or adjust your exact appliance zones to estimate UL 300 wet-chemical flow points and semi-annual link counts.

2. Estimated UL 300 flow points & semi-annual parts

Planning model based on typical 3.0-gallon (~11 flow points) and 1.5-gallon (~5 flow points) wet-chemical cabinets. Ansul and R-102 are trademarks of Johnson Controls; independent planning tool.

Total Flow Points
24 pts
16 appliance + 4 plenum + 4 duct
Nozzle Drops & Caps
14 nozzles
14 blow-off caps checked every 6 mo
Semi-Annual Links
8 / visit
16 links replaced per year (2 visits)
Cylinder Configuration
2 main + 1 aux
2 × primary tank + 1 × auxiliary half-tank (3.0-gal / 1.5-gal tank equivalent)
Cookline appliances (67%)Plenum + duct collars (33%)
Quote audit tip: When reviewing your fire-protection vendor invoice, verify that the line-item fusible link count matches the 8 detection brackets inside your hood and duct collars—and that all 14 nozzle grease caps are intact.

Save this hood spec into your 6-month PDF log

Email a printable 4-block suppression binder card prefilled with your hood label and get 30, 7, and 1-day alerts before your next link swap.

Open prefilled pricing comparison

Important trademark and engineering boundary: Ansul and R-102 are registered trademarks of Johnson Controls, and Pyro-Chem, Amerex, Kidde, and Buckeye are trademarks of their respective manufacturers. Kitchen Suppression Due is completely independent and unaffiliated with those brands. This browser calculator applies generalized UL 300 planning allowances so restaurant buyers and facilities teams can audit quotes and spot under-capacity risks before a remodel—never to design piping or select actual nozzle part numbers.

Public compliance guidance (https://www.markel.com/insights-and-resources/insights/fire-protection-systems-in-restaurants, read 2026-11-13) notes that commercial cooking extinguishing systems should be maintained at least every six months by properly trained, qualified, and certified technicians under NFPA 96 and NFPA 17A (https://www.nfpa.org/codes-and-standards/nfpa-17a-standard-development/17a).

Typical UL 300 commercial cookline planning benchmarks

Planning ranges only for restaurant operator quote checks. Brand-authorized technicians size final nozzles from the exact manufacturer listing manual.

Protection zoneTypical nozzle dropsPlanning flow units6-month inspection check
Commercial deep-fat fryer vat1–2 high-flow drops2 to 3 ptsAiming angle over vat + drip board; intact blow-off cap
6-burner open-top gas range2 appliance drops2 to 3 ptsVerify no salamander/shelf added that blocks spray cone
Charbroiler / radiant grill bay1–2 high-heat drops2 pts per bayHigher-temperature fusible link rating over broiler zone
High-BTU commercial wok station2 dedicated perimeter drops3 pts per wokMetal foil caps & high-temp links for intense plume heat
Hood grease plenum & exhaust collar1 / 4 ft plenum + 1 / collar1 pt / 4 ft + 2 pts / collarDuct-collar fusible link stamp year + unobstructed baffle bank

Related guidance

Kitchen fire suppression inspection cost calculator

Turn your estimated link and cylinder counts into 6-month service and 12-year hydrotest budgets.

Semi-annual hood tag & Class K due-date tracker

Project your exact six-month tag renewal date alongside Class K 5-year hydrotests.

UL 300 wet-chemical hood suppression checklist

Inspect blow-off caps, nozzle aiming, appliance caster stops, and gas shutoff interlocks.

Commercial hood 6-month tag & fusible link log

Record cabinet brand labels, link stamp years, and cartridge checks in your kitchen binder.

All commercial kitchen suppression calculators

Return to the calculator hub for sizing, service cost, and tag deadline tools.

Tailored PDF binder sheet & 30/7/1-day alerts

Save your hood configuration into a printable 4-block checklist with email reminders.

What a flow point means inside a UL 300 wet-chemical cabinet

Before UL 300 took effect, older dry-chemical kitchen systems relied on powders that struggled when high-efficiency commercial fryers retained extreme oil heat after burner shutoff. Modern wet-chemical systems discharge a potassium-based saponifying mist that reacts with hot cooking fats to form a cooling foam blanket over the oil surface while simultaneously protecting the hood plenum and exhaust riser.

To make sure every nozzle discharges at the pressure and duration tested at the laboratory, manufacturers assign each nozzle tip a flow value—commonly one, two, or three flow points depending on orifice flow rate—and cap how many total points a single three-gallon or one-and-a-half-gallon stainless cylinder can supply. If a cookline remodel pushes total demand from eleven points to fourteen points, a single eleven-point cylinder can no longer cover the line without adding an auxiliary tank or manifolded dual-tank assembly.

Why deep-fat fryers, woks, and charbroilers consume more capacity

Not every thirty-six-inch space under an exhaust canopy carries the same fire load. A flat-top pancake griddle holds a thin film of oil on steel plate and typically requires fewer flow units than a split-vat commercial fryer holding fifty to eighty pounds of shortening alongside an integral drainboard. High-output fryers frequently require multi-flow or dual-nozzle coverage so saponifying mist blankets both the vat surface and splash zones.

Commercial woks and lava-rock or radiant charbroilers introduce two extra challenges: intense vertical heat plumes and heavy radiant embers. High-BTU wok bowls typically require dedicated perimeter nozzles aimed so the chef’s ladle does not shear off the tip, plus higher-temperature detection hardware or metal foil blow-off caps that will not soften during peak dinner service. Review our UL 300 wet-chemical suppression checklist before swapping low-heat prep equipment for fryers or broilers.

Don’t forget plenum and exhaust duct collar flow demand

Restaurant owners counting nozzles from the kitchen floor often look only at the chrome drops pointing down toward the burners and forget the hidden piping above the baffle filters. Every Type I grease hood also requires plenum nozzles spaced along the filter chamber plus dedicated duct nozzles shooting upward into each exhaust collar.

On a sixteen-foot canopy with two exhaust collars, plenum and duct protection alone can consume seven to nine flow points before a single range or fryer is counted. That overhead baseline explains why a seemingly modest casual grill line often steps up from a single cabinet into a tandem cylinder configuration.

Estimating semi-annual fusible link and blow-off cap counts

Mechanical detection lines run stainless aircraft cable under tension through series brackets mounted inside the hood plenum and beneath each exhaust duct collar. Each bracket holds a fusible alloy link—or a frangible glass bulb—stamped with its temperature rating and four-digit manufacture year. During semi-annual maintenance, technicians cut out the fatigued links, install fresh dated links, and verify tension and manual pull travel.

Counting your duct collars and appliance zones gives you a practical sanity check for vendor quotes, which you can model in dollars inside our kitchen suppression inspection cost calculator. Likewise, every nozzle drop counted in this estimator needs an intact rubber or metal grease blow-off cap; a single missing cap lets vaporized frying oil bake inside the brass orifice and block agent discharge during an actual fire.

Preparing for second-generation restaurant leases and menu pivots

Signing an ”as-is” second-generation restaurant lease is the single most common moment operators discover an undersized hood cabinet. The prior tenant may have operated a bakery convection oven and soup kettle line using six total flow points, whereas your incoming fried-chicken concept needs four pressure fryers and a charbroiler.

Run your proposed equipment count here before finalizing lease tenant-improvement budgets, ask a brand-authorized contractor in your state—such as Florida, Illinois, or Georgia—to inspect the existing cabinet model label on site, and log your resulting cabinet details on our 6-month hood tag and fusible link tracker so future managers preserve the exact setup.

Questions

How many flow points does a typical 3-gallon wet-chemical tank support?

Depending on the exact UL 300 manufacturer listing, a primary three-gallon commercial cylinder commonly supports roughly 11 to 12 flow units, while compact auxiliary cylinders support roughly 5 to 6 units. Only the manufacturer design manual for your specific model governs.

Do moved appliances on caster wheels require a technician check if we did not buy new gear?

Yes. Swapping the left-to-right order of a fryer and a griddle puts high-flow fryer nozzles over a griddle and low-flow griddle nozzles over hot shortening. Ask a brand-authorized technician to re-pipe and re-certify before cooking.

Are fusible links replaced at every six-month inspection or once per year?

Many service contractors replace alloy fusible links at every six-month visit so heavily greased cookline links never fail prematurely, while NFPA 17A sets minimum replacement intervals by detector type. Ask your contractor whether links are billed every visit and request the removed links for your binder check.

Does this estimator select official Ansul or Pyro-Chem nozzle part numbers?

No. Nozzle part stamping, drop height, offset aiming, and pipe equivalent length must be calculated exclusively by a licensed, factory-authorized technician using current manufacturer manuals.

kitchen fire suppression inspection

Next: Calculate 6-month inspection cost & 12-year hydrotest reserve

Ansul & UL 300 Hood Nozzle Flow-Point & Link Estimator